BOISE CASCADE PLYWOOD PLANT DUCTING

“Design, supply and turnkey removal & reinstallation of a new hot gas ducting system”

Project Description

PES’ scope of supply included three separate contracts for the design, supply and turnkey removal and reinstallation of a new hot gas ducting system. The ducting supplies energy from a Biomass Energy System to three veneer dryers with seven (7) zone control dampers and seven (7) return dampers. Return gas goes to the Energy System for re-burn and to the final gas cleanup system. PES provided the following:

  • Complete design of new ducting system including damper, expansion joints and supports.
  • Design replaced a non-functioning design for the 850 F supply and 350 F return conditions.
  • The process flow conditions were determined and evaluated for the new design.
  • All the GA and detail drawings for fabrication and installation were produced in ACAD.
  • Design of ducting allowed for installation over a two and a half week 24/7 plant outage.
  • Fabrication of all the ducting system from Corten Steel.
  • Supply of all materials for the complete ducting replacement including stainless exp. joints.
  • Removal of all the existing ducting to be replaced with new design.
  • Complete mechanical installation of the new ducting system.

Complete re-insulation of all ducting with removable blankets at access and expansion joints.

 

Project Details

Client Boise Cascade
Date 2008
Services Design, supply, turnkey removal and reinstallation of ducting system.
Location Kettle Falls, WA

Project Features

The ducting supplies energy from a Biomass Energy System to three veneer dryers with seven (7) zone control dampers and seven (7) return dampers.

Project Features

Design of ducting allowed for installation over a two and a half week 24/7 plant outage.