by Leah K | Jan 1, 2016 |
Sludge-to-Energy System “The energy system provides 35,000 lb. /hr. of steam to the mill, offsetting previous natural gas consumption and significant tipping fees for sludge disposal resulting in a payback of 1 ½ to 2 years.” Project Description Our client...
by Leah K | Jan 1, 2016 |
BECROMAL OF AMERICA & EAGLE BEND ENERGY “Customized fluid bed gasification system” Project Description Becromal of America & Eagle Bend Energy jointly own a 5MW cogeneration plant near the community of Clinton,...
by Leah K | Jan 1, 2016 |
BETHEL, ALASKA “Feasibility study for a new 90MW generating facility” Project Description PES was engaged for an in-depth feasibility study for the development of a new 90MW generating facility in the remote community of Bethel,...
by Leah K | Jan 1, 2016 |
BFC GAS & ELECTRIC “Built largely around refurbished and upgraded equipment, the unit it currently building upon its long-term history of economic success & reliability” Project Description The BFC Gas & Electric project is a 6.0-megawatt...
by Leah K | Jan 1, 2016 |
COLVILLE INDIAN POWER & VENEER “Wood residual-fueled 120,000 PPH 600 psig/750 °F Boiler” Project Description Colville Indian Power and Veneer (CIPV) operates an integrated plywood manufacturing facility near Omak, Washington, and engaged PES to...