Sludge-to-Energy System “The energy system provides 35,000 lb. /hr. of steam to the mill, offsetting previous natural gas consumption and significant tipping fees for sludge disposal resulting in a payback of 1 ½ to 2 years.” Project Description Our client...
by Leah K | Jan 1, 2016 |
BECROMAL OF AMERICA & EAGLE BEND ENERGY “Customized fluid bed gasification system” Project Description Becromal of America & Eagle Bend Energy jointly own a 5MW cogeneration plant near the community of Clinton,...
by Leah K | Jan 1, 2016 |
BOISE CASCADE PLYWOOD PLANT DUCTING “Design, supply and turnkey removal & reinstallation of a new hot gas ducting system” Project Description PES’ scope of supply included three separate contracts for the design, supply and turnkey removal and...
by Leah K | Jan 1, 2016 |
COLVILLE INDIAN POWER & VENEER “Wood residual-fueled 120,000 PPH 600 psig/750 °F Boiler” Project Description Colville Indian Power and Veneer (CIPV) operates an integrated plywood manufacturing facility near Omak, Washington, and engaged PES to...